Loading roadmap...
How OSPRE SOLUTIONS INC. would sequence draft PWS Tasks 5.1-5.4 (RFI 36C10B26Q0834) from award through Option Period 2. Task numbers and titles are quoted from the draft PWS. Every benchmark is a proposed target, not a result. Wave timing is illustrative.
Select a phase. Arrow keys move between phases. Swipe the timeline sideways to see all nine.
Proposed target IllustrativeLoading roadmap...
The same content as the timeline, as plain text. Benchmarks are proposed targets, not results.
| Phase | What OSPRE does | Draft PWS tasks | Goals and benchmarks (proposed targets) |
|---|
VA planning figures, verbatim. The RFI gives no dates for the waves; the timeline places them for illustration only.
| Measure | Wave 1 | Wave 2 | Wave 3 | Wave 4 | Wave 5 | Wave 6 |
|---|---|---|---|---|---|---|
| Notified (provisioned, informed) | 110,000 | 250,000 | 540,000 | 540,000 | 540,000 | 540,000 |
| Chat MAUs | 30,000 | 39,000 | 50,700 | 65,910 | 85,683 | 111,388 |
| Agentic MAUs | 1,062 | 7,800 | 15,210 | 32,955 | 51,410 | 83,541 |
| Code MAUs | 650 | 1,023 | 1,302 | 1,581 | 1,800 | 2,300 |
"MAU = Monthly Active Users. Active is defined as having sent at least one message."